Typical Completed Projects

Remote Pipeline Exposure, Utah

SBT was tasked by a pipeline operator in Utah to find an economical means of providing concrete mats to place an erosion control structure over two exposed pipelines in a common R.O.W. The pipelines were on a steep slope, bounded by active an rail line on one side and a cliff on the other. The only access would be by rail and tracked machinery.

SBT was able to ship empty SeaMat forms from Houston to Utah for very little cost and inflate the mats at a staging area by the rail line close to the exposures. The mats were then assembled into the engineered structure required to protect the lines.