Typical Completed Projects

Dutch West Indies

SBT was tasked by an offshore terminal facility to provide a “landing” ScourMat 150’ long over irregular hard bottom to prepare the beach approach for a new 4” nitrogen pipeline. After the line was installed another mat 15’ long would be used to cover and protect the line from the concrete jacks replaced on the approach. The two ScourMats were shipped from Houston to the location for under $1000 and inflated with local concrete.